Coal tar epoxy coating
Product Name:
Coal tar epoxy coatingModel No.:
Product Abstract:
The paint is divided into two sets, A made up of epoxy resin, coal tar and colorant and B curing agent. The paint has not only an excellent feature of water resistance and very good adhesive force but also good rigidity, wear resistant and especially prominent three proofings. The paint can be used on seaport facilities, shipping, bridge beams, offshore oil extraction equipment, mining and hydro-power facilities. It can be directly spread on the surface of iron or steel or be blended with priming paint.
- Product Description
Coal tar epoxy coating
I. Overview:
The paint is divided into two sets, A made up of epoxy resin, coal tar and colorant and B curing agent. The paint has not only an excellent feature of water resistance and very good adhesive force but also good rigidity, wear resistant and especially prominent three proofings. The paint can be used on seaport facilities, shipping, bridge beams, offshore oil extraction equipment, mining and hydro-power facilities. It can be directly spread on the surface of iron or steel or be blended with priming paint.II. Technical Qualification:
Item
Unit
Index
Color
-
Brownish black
Viscosity (4 cups) 25 ℃
s
≥40-100
Fineness
μm
≤80
Coating thickness
mm
Wet 80-100, dry 40-60
Surface drying time
h
≤4
optimum drying time
h
≤24
Solid
h
≤160
Flexibility
mm
≤1
Cohesive force (Scratching method)
Grade
≤2
Impact force
cm
≥40
III. Construction Techniques:
Surface treatment
Derusting grade should pass Sa2.5 of GB8923-88 if spread directly on iron or steel surface. If used as middle-level paint, the spread surface should be clean, anhydrous, oil-stainless and dustless.
Proportioning
A:B = 4: 1
Diluent agent
epoxy diluent agent 0-5%
Backgrounding
The constituent should be used up in 4 hours after blending
Spreading
brush painting, roll painting, airless spray painting
Dosage
200g/m2
Brush coating layers
3-6 layers
IV. Construction Precautions:
1、 Construction should be carried out with good ventilation and safeguard measure should be taken if longtime construction is carried on.
2、 Open flames are prohibited on construction site.
3、 Manual construction should be avoided if the surface temperature of iron or steel is 3 ℃ over dew point.
4、 No construction should be carried out when it is foggy, rainy or snowy or the humidity is over 85%.
5、 The construction temperature should be over 10 ℃ .
V. Storage and Transportation:
Avoid collision while conveying. Store where it is cool and ventilative. The storage period is one year. Expired products can still be used if they pass the standard test. Moisture penetration and exposure to sunlight are strictly forbidden.
- Related Products
- [Return Home] [Print] [Go Back]
Categories
Products Search
Contact Us
Contact Person:
Fang zhiguoTel:
0316-6849035Fax:
0316-2165939E-mail:
xiaoshou@Lfxunda.com-




















